– Creating More Practical Internal Layouts –

Load-Bearing Wall Removal and Structural Alterations in Croydon

Alter your property layout through carefully coordinated structural building work. Nodir personally reviews the proposed project and remains your principal point of contact throughout the agreed construction process.

10+ Years of Experience

Practical experience across building, renovation and property-improvement work.

Free Site Visits & Quotations

The property, visible conditions and proposed work can be reviewed before the quotation is prepared.

Personally Coordinated by Nodir

One principal point of contact throughout the agreed building project.

One-Year Workmanship Guarantee

Workmanship completed by EBS is supported by a one-year guarantee, subject to the agreed terms.

– Altering Existing Property Layouts –

Structural Work Guided by the Right Technical Information

Removing a wall or forming a new opening can significantly change how an existing property is used, but the work must be planned around the building’s structure. Before construction begins, the wall’s role, the loads above and the support required must be established through appropriate professional assessment.

EBS carries out agreed structural building work using the available drawings, calculations and specifications. This may involve controlled removal, temporary support, installation of the specified structural components and making good the affected areas.

Nodir remains your principal point of contact, coordinating the agreed construction stages and discussing any conditions that become visible after opening-up work begins.

Work based on appropriate structural information
Controlled preparation and removal stages
Installation of specified structural supports
Making good around the completed alteration

EBS does not itself determine whether a wall is load-bearing or produce structural calculations. The required assessment, drawings and calculations must be provided by an appropriately qualified structural professional. If EBS assists with coordinating any separate professional input, that responsibility must be confirmed in writing.

– Structural Building Services –

Structural Alterations for Existing Properties

The required work will depend on the existing structure, proposed layout and technical information prepared for the project. EBS carries out the agreed construction work in accordance with the provided drawings, calculations and specifications.

01

Load-Bearing Wall Removal

Controlled removal of a wall confirmed as load-bearing, together with the support specified by the structural design.

The agreed work may include:

  • Protecting adjacent areas
  • Installing specified temporary support
  • Controlled wall removal
  • Installing the specified permanent support
02

Internal Partition Alterations

Removal, formation or adjustment of internal partitions where their structural role and the proposed layout have been appropriately established.

The agreed work may include:

  • Removing specified partitions
  • Forming new internal walls
  • Adjusting door positions
  • Making good affected surfaces
03

New Structural Openings

Formation or alteration of openings within existing walls where supported by appropriate technical information.

The agreed work may include:

  • New internal door openings
  • Wider openings between rooms
  • Specified external openings
  • Preparation for agreed doors or windows
04

Specified Structural Support Installation

Installation of steel beams or other structural components—sometimes referred to generally as RSJs—in accordance with the project drawings and calculations.

The agreed work may include:

  • Preparing the support locations
  • Coordinating delivery and access
  • Installing specified beams or supporting components
  • Making good around the completed installation

The correct structural solution must be specified by an appropriately qualified structural professional. References to an RSJ or steel beam are general terms only; the type, size, bearing details and installation requirements must follow the project-specific design.

– Coordinated Structural Work –

What Can Be Included in a Structural Alteration?

Depending on the property, the structural information provided and the agreed specification, EBS can coordinate the construction stages required to complete the proposed alteration.

01

Protection and Site Preparation

  • Protecting agreed access routes and adjacent areas
  • Preparing the working area
  • Arranging access for materials and structural components
02

Opening-Up and Service Coordination

  • Completing agreed opening-up work
  • Identifying visible services within affected areas
  • Coordinating required isolation or alteration through suitable trades
03

Specified Temporary Support

  • Preparing temporary-support locations
  • Installing support required by the provided design
  • Maintaining support during the agreed structural work
04

Controlled Removal Work

  • Removing specified wall sections
  • Completing work in the required sequence
  • Managing agreed debris removal from the work area
05

Bearings and Support Locations

  • Preparing specified bearing positions
  • Installing agreed padstones or supporting components
  • Following the dimensions and details within the structural information
06

Structural Component Installation

  • Coordinating delivery and movement of specified components
  • Installing the specified beam or structural support
  • Completing associated connections where detailed
07

Associated Building Work

  • Reinstating agreed areas around the alteration
  • Coordinating affected services where included
  • Completing necessary wall and ceiling preparation
08

Making Good and Finishing

  • Plasterboarding and plastering affected areas
  • Completing agreed joinery or trim work
  • Decorating and finishing where included in the quotation

The exact work included will depend on the property, structural design, access, service locations, required inspections and written quotation. Temporary works, structural components, bearings and connections must follow the project-specific drawings, calculations and specifications. Work arising from previously concealed conditions is not included unless added to the agreed scope.

– Before Structural Work Begins –

Site Conditions That Can Affect the Work

Structural alterations must be planned around the existing construction, access and conditions within the affected area. These factors can influence the working method, programme and final quotation.

Existing Construction

The property’s age, construction type and condition may affect how the specified alteration can be completed.

01
02

Concealed Services

Electrical cables, plumbing, heating pipework or other services may be discovered when opening-up work begins.

Access and Component Handling

Access routes, available working space and the safe movement of structural components must be considered before installation.

03
04

Occupied Areas and Protection

Where the property remains occupied, suitable protection, working boundaries and access arrangements should be agreed in advance.

An initial site visit helps EBS understand the visible conditions and practical construction requirements. It does not replace structural assessment, drawings, calculations, surveys or opening-up work that may be required before the final scope can be confirmed.

– From Technical Information to Completion –

How Structural Alteration Work Is Coordinated

Each project is planned around the property, agreed scope and structural information provided. Nodir remains your principal point of contact throughout the construction process.

01

Site Visit and Information Review

EBS reviews the proposed alteration, visible site conditions, access and available structural drawings, calculations and specifications.

02

Quotation and Work Preparation

The construction scope, quotation and anticipated sequence are agreed, with required technical information and third-party responsibilities identified before work begins.

03

Structural Building Work

The affected area is prepared before the specified temporary support, controlled removal and permanent structural components are completed in the required sequence.

04

Inspections and Making Good

Required inspection stages are accommodated, followed by the agreed reinstatement, making good and finishing work.

!

The programme depends on the required structural information, site conditions, material availability and any necessary third-party inspections or approvals. EBS cannot guarantee the timing or outcome of decisions made by structural professionals, Building Control or other external parties.

– Technical and Statutory Requirements –

Responsibilities to Confirm Before Work Begins

Structural alterations can require professional design information, Building Regulations approval and, in some circumstances, Party Wall procedures. These responsibilities should be established before construction starts.

01

Structural Engineer

An appropriately qualified structural professional should assess the proposed alteration and provide the necessary drawings, calculations and support details.

02

Building Regulations

Removing a load-bearing wall normally requires Building Regulations approval. Other structural alterations may also require approval, and the property owner must ensure that the correct application and required inspections are arranged.

03

Party Wall Procedures

The Party Wall etc. Act may apply where work affects a shared wall or party structure. Where applicable, the building owner is responsible for following the required notice and any necessary agreement or dispute-resolution procedures before work starts.

04

EBS Construction Role

EBS carries out the agreed building work using the project-specific drawings, calculations and specifications provided, while accommodating required inspection stages. Any additional coordination responsibility must be confirmed in writing.

!

EBS does not itself provide structural engineering, Building Control approval or Party Wall surveying. If EBS assists with coordinating any separate professional service, that responsibility must be expressly confirmed in writing. Property owners should obtain independent professional advice where they are unsure which requirements apply.

– Completed Structural Work –

Featured Structural Alteration Project in [Confirmed Location]

EBS completed the agreed structural alteration work at this property using the project-specific drawings, calculations and specifications provided. The work involved [confirmed scope], followed by [confirmed making-good or finishing work].

✓ Protection and preparation of the affected area
✓ Installation of specified temporary support
✓ Controlled removal of the identified wall section
✓ Installation of the specified structural support
✓ Making good around the completed alteration
– Customer Confidence and Practical Answers –

Planning Your Structural Alteration with Confidence

Verified Customer Feedback

9.95 /10
173 Checkatrade reviews
June 2018 Checkatrade member since

Eco Building Solutions is rated 9.95/10 from 173 Checkatrade reviews and has been a Checkatrade member since June 2018.

View Verified Customer Reviews

This rating reflects customer feedback across EBS’s overall range of building, renovation and maintenance services and is not specific to structural-alteration work.

Read More Customer Reviews

Structural Alteration Questions

A wall’s structural role should be established by an appropriately qualified structural professional. EBS does not determine whether a wall is load-bearing without the required professional assessment and technical information.

Load-bearing wall removal normally requires project-specific structural information showing the required support, bearings and installation details. The exact information needed should be confirmed by the appointed structural professional.

Removing a load-bearing wall normally requires Building Regulations approval. Other structural alterations may also require approval, so the correct application and inspection requirements should be confirmed before work starts.

Timescales depend on the alteration, structural design, access, component availability, inspection stages and making-good requirements. EBS will provide an anticipated programme once the agreed scope has been established.

This depends on the location and extent of the alteration, the required temporary support and how the work affects access and essential services. Practical arrangements should be discussed before construction begins.

EBS will discuss the condition discovered and explain how it may affect the agreed work. Additional investigation, revised technical information or a variation to the quotation may be required before work continues.

– Plan Your Structural Alteration –

Discuss Your Proposed Structural Work

Tell us about the alteration you are considering and any structural drawings or calculations already available. We can arrange a free site visit to discuss the visible conditions, construction requirements and next steps.

Free Site Visits & Quotations Personally Coordinated by Nodir One-Year Workmanship Guarantee

Structural Alteration Services Across Croydon and Nearby Areas

Based in South Croydon, EBS provides structural alteration and load-bearing wall removal services across Croydon and surrounding areas, including Purley, Coulsdon, Sutton, Bromley and Epsom. View all the areas we cover, or contact us to confirm availability for your property.

Scroll to Top